The Bergvik Iso Floor solution is incredibly versatile. Working with EDPE and CFS has been fantastic, both companies understood our requirement from day one and worked with us to achieve all project milestones.
Andy Jarvis Senior Site Manager - Morgan Sindall Infrastructure, IFA2 Project
The Bergvik Iso Floor solution is incredibly versatile. Working with EDPE and CFS has been fantastic, both companies understood our requirement from day one and worked with us to achieve all project milestones.

EDP Europe (EDPE) and Critical Facilities Solutions (CFS) were appointed primary contractor to install 400 m2 of specialised Bergvik Iso Floor system into several Power & Plant areas for the National Grid on behalf of Morgan Sindall Infrastructure and ABB.
This is a major new energy infrastructure project, known as Interconnexion France-Angleterre 2 (IFA2), linking the United Kingdom’s electricity transmission network to France. The link will help enhance the security, affordability, and sustainability of energy supply to both countries. IFA2 will be an electricity interconnector, this is a connection between the electricity transmission systems of different countries. The Interconnector will be capable of exchanging 1,000 Mega Watts of power between Britain and France, enough to run over 1,000,000 homes.
The Bergvik Iso floor system is dynamic with a unique design that allows for easy adaptation to ever-changing technologies; equipment densities; equipment footprint, and increased cooling demands. The Iso floor system has up to 70% fewer pedestals compared to conventional 600 x 600 mm grid floors.
The installation started in early February 2020 with a tight timescale that left little room for error. The flexibility of the Bergvik Iso Floor system enabled the EDPE & CFS team to work successfully with Morgan Sindall and ABB on the floor frame installation which was easily adapted to facilitate the complex underfloor containment install. In addition to the Iso sub-floor frame, 80 specialised mounting frames were built and installed onto the sub-floor frame for High Voltage equipment to be sited. The floor was finished off with bespoke sized Bergvik laminate floor panels. The installation was completed on time and to budget with all major installation milestones achieved.
Some of the major features and cost saving benefits of the Bergvik Iso Floor systems include:
Morgan Sindall Group plc is a leading UK construction and regeneration group, employing around 6,700 people and operating in the public, regulated and private sectors. It reports through six divisions of Construction & Infrastructure, Fit Out, Property Services, Partnership Housing, Urban Regeneration, and Investments.
ABB (ASEA Brown Boveri) is a Swiss-Swedish multinational corporation headquartered in Zurich, Switzerland, operating mainly in robotics, power, heavy electrical equipment, and automation technology areas. ABB in the UK is headquartered in Warrington, Cheshire and employs 1800 people operating from around 15 locations nationwide. ABB have a long track record of innovation. Many of the technologies that underlie our modern society, from robot automation to a revolutionary approach to ship propulsion, were developed or commercialized by ABB.
Stay updated with articles that explore design, strategy, and innovation. My blog offers tips, case studies, and reflections on the latest trends and best practices in the industry.
Since 2006, Bergvik Sweden has been our go-to supplier for raised access flooring in our data centres. They deliver very high quality in terms of both materials and service, and I am convinced that their Iso Floor construction will become standard in all data centres, just as it already is in electrical rooms.
Erik Kjellin, Projekt Manager, Availo Networks

Bergvik Sweden AB has been honoured to supply installation flooring to EcoDataCenter in Falun. This is the world's greenest data centre!