Electrical Equipment Rooms
Floors
Sweden
Other Europe
North America
Sub-Saharan Africa
Asia-Pacific

Brista 2 CHP-Plant in Sigtuna

The flexibility of the floor due to the different sized floor panels makes cabling and maintenance simple and easy! Bergvik always has good service and is a safe and reliable supplier, and that is what makes us choose Bergvik.
Kent Häggman, Project Manager - Goodtech Project & Services

The flexibility of the floor due to the different sized floor panels makes cabling and maintenance simple and easy! Bergvik always has good service and is a safe and reliable supplier, and that is what makes us choose Bergvik.

Bergvik delivers flooring to brista 2 CHP-plant in Sigtuna

On November 29, 2013, Fortum’s new CHP plant, Brista 2, was inaugurated in Sigtuna Municipality, Sweden. Goodtech Projects & Services AB was to deliver telecommunication and fire alarms, installation of floors, power supply, general power and lighting in collaboration with ABB. For this project, 130 employees from Goodtech were involved. Raised Access flooring was required for 1478m2 within the power plant. Bergvik was chosen as the flooring supplier for the project.

”We have been working with Bergvik for a long time and it has always worked out great!”
says Kent Häggman, Project Manager for Goodtech Project & Services. Bergvik’s capability to provide a turnkey solution was one of the decisive factors with its own project management, local presence and smart accessories, such as the Mounting clamp.

Heavy loads

Bergvik’s mission was to supply a flexible raised floor for Switchgear Rooms that could withstand heavy loads, as one of the rooms would house 4 transformers of 6 tonnes each. The floor was built with reinforced transport corridors so that the transformers could be rolled in after the floor installation. In total, 19 Switchgear floors were delivered for this project from Bergvik to Goodtech. Each floor was designed, manufactured, delivered and installed within 3 weeks. Deliveries to Brista took place continuously from November 2012 to July 2013.

Project facts

Brista 2 can handle 240,000 tonnes of combustible waste from households and industry per year and provides a supplement of district heating and electricity, corresponding to the demand for 50,000 normal-sized apartments per year. Annual production is estimated at 500 GWh of heat and 140 GWh of electricity. Brista 2 is owned by 85% of AB Fortum Värme together with the City of Stockholm and 15% by Sollentuna Energi.

This is Goodtech

Goodtech provides project management and customized solutions in electrical and process assembly, power and automation. The Goodtech Group has sales of more than 2.5 billion SEK a year and employs 1500+ people.

See all References

Related References

Stay updated with articles that explore design, strategy, and innovation. My blog offers tips, case studies, and reflections on the latest trends and best practices in the industry.

Data Centre
Floors
Availo Data Center, Stockholm
Since 2006, Bergvik Sweden has been our go-to supplier for raised access flooring in our data centres. They deliver very high quality in terms of both materials and service, and I am convinced that their Iso Floor construction will become standard in all data centres, just as it already is in electrical rooms.
Since 2006, Bergvik Sweden has been our go-to supplier for raised access flooring in our data centres. They deliver very high quality in terms of both materials and service, and I am convinced that their Iso Floor construction will become standard in all data centres, just as it already is in electrical rooms.
Erik Kjellin, Projekt Manager, Availo Networks
Data Centre
Floors
Eco Datacenter, Falun
Bergvik Sweden AB has been honoured to supply installation flooring to EcoDataCenter in Falun. This is the world's greenest data centre!
Bergvik Sweden AB has been honoured to supply installation flooring to EcoDataCenter in Falun. This is the world's greenest data centre!